Advanced Asphalt Company
0 City of Chicago, Cook County and federal contracts in the last 10 years ($0 in total), 0 still running · 0 Cook County bids on record, lowest price on 0.
Contracts
- No city or county contracts under this name in the last 10 years.
Cook County bids
- No Cook County bid tabulations under this name.
IDOT lettings won
48 contracts where this company was the low bidder ($205M in total).
- 11.5 miles of resurfacing from LaSalle 0.3 miles west of IL 178 to west of Fox River on interstate 80 north of Ottawa.LaSalle · contract 66T48$19M0 other bidslet Nov 6, 2026
- Milling and resurfacing IL 26 from Spring Bay to NCL to IL Rte 116 in Tazewell and Woodford Counties. Approximately 6.87 miles gross length.Tazewell, Woodford · contract 68K27$1.8M1 other bidlet Jul 31, 2026
- Milling, resurfacing,_pavement marking, and aggregate construction on a frontage north of I-80 beginning at a dead end (L.M. 0.00) in Bureau County and ending approximately 85 feet west of Plank Rd. in LaSalle County. 1.36 miles gross length.Bureau, LaSalle · contract 66T13$729,4120 other bidslet Jul 31, 2026
- HMA patching on IL 8/IL 78 from Il 8 to Main St in Elmwood. Approximately 0.53 miles gross length.Peoria · contract 68L02$253,8251 other bidlet Jul 31, 2026
- Pavement resurfacing on the I-80 and I-39 interchange entrance/exit ramps with minor rehabilitation and repair work at select structures, improvements to existing pipe and box culverts, slope and ditch grading, upgrading guardrails, impact attenuators, high tension cable barriers, and superelevation on FAI 80(I-80) from 0.1 miles east of IL-351 to 0.3 miles west of IL-178. Approximately 4.13 miles gross length.LaSalle · contract 66A91$20M0 other bidslet Jun 12, 2026
- Resurfacing IL 6 from north of IL 29 to IL 40 (Knoxville Ave) in Peoria in Peoria County. 2.94 miles gross length.Peoria · contract 68C93$11M1 other bidlet Jun 12, 2026
- 9 miles of patching, CIR, resurfacing, guardrail replacedment, and ADA ramps on IL 117 from south of Raymond St to the US 150 intersection and on US 150 from west of the IL 117 intersection to the McLean County Line.Woodford · contract 68J70$8.5M1 other bidlet Jun 12, 2026
- Resurfacing IL 89 from the Putnam County line to IL 17, South of Varna in Marshall County. 5.527 miles gross length.Marshall · contract 68J72$5.4M0 other bidslet Jun 12, 2026
- Partial and full depth patching on IL 93 from IL 91 (S) to IL 40 in Stark County. 9.54 miles gross length.Stark · contract 68K98$376,4140 other bidslet Jun 12, 2026
- 8.4 miles of CIR and design overlay of IL 17 from the eastern city limits of Lacon to IL 89.Marshall · contract 68J95$9.4M0 other bidslet Apr 24, 2026
- 6.5 miles of resurfacing and cold in-place recycling on IL 8 from Texas Rd to Taylor Rd in Peoria County.Peoria · contract 68J89$4.5M1 other bidlet Apr 24, 2026
- 5.75 miles of milling and HMA resurfacing of US 6/34 with 3-4 foot aggregate wedge shoulders when curb and gutter is not present, ADA ramp, and other minor drainage improvements. Located on US 6/34 from 175 ft. east of Hazelwood Dr. in Wyanet to 90 ft. west of Main St. in Princeton, within Bureau County.Bureau · contract 66P86$4.4M0 other bidslet Apr 24, 2026
- 6.45 miles of resurfacing from the southern city limit of Bradford to the west leg of IL 17. Milling and resurfacing and minor drainage improvements at the IL 40 Camp Grove Rest Area located 0.6 mile north of the west leg of IL 17 are also included.Stark · contract 68K20$2.8M0 other bidslet Apr 24, 2026
- 3.49 miles of resurfacing of IL 8 (W. Southport Rd) from 0.7 mile east of Taylor Rd to I-474 in Peoria County.Peoria · contract 68J88$2.0M1 other bidlet Apr 24, 2026
- 8.765 miles of resurfacing and cold-in-place recycling on IL 17 from IL 89 to west of I-39 in Marshall County.Marshall · contract 68J96$7.8M0 other bidslet Feb 27, 2026
- 7.53 miles of resurfacing on IL 90/IL 91 from IL 91(N) in Princeville to IL 91(S), north of Dunlap; and on IL 90 from the IL Rte 90/IL Rte 91 Junction (E) to IL Rte 40; and on SN 072-0035 carrying IL 90 over Kickapoo Creek Tributary.Peoria · contract 68J57$5.1M1 other bidlet Feb 27, 2026
- Milling and resurfacing 3 3/4" (designed overlay)_on FAP 587 (US 34) beginning 0.6 mile east of I-39 and ending at E 12th Road in Earlville. Additional work includes micro-surface with high friction aggregate and sinusoidal rumble strips in the curves, ditch cleaning, culvert cleaning, and end section replacements, pavement marking, and raised reflective pavement markers. 7.07 miles gross length.LaSalle · contract 66P67$3.6M1 other bidlet Feb 27, 2026
- HMA resurfacing of CH 29 from IL 18 to CH 64 in LaSalle County. Additionally includes HMA shoulders, aggregate shoulders and other required work.LaSalle · contract 87910$1.2M1 other bidlet Feb 27, 2026
- Rehabilitate Runway 7/25, Remark Runway 18/36, and Remark TaxiwaysLaSalle · contract IL035$1.1M0 other bidslet Feb 27, 2026
- 12.4 miles of patching, milling, and resurfacing on Osco Rd from IL 81 to US 6.Henry · contract 64U16$6.0M2 other bidslet Jan 16, 2026
- 11.4 miles of patching, cold milling, and standard overlay on IL 78 from 0.2 mile north of IL 92 in Henry County to north of west 8th St in Prophetstown, Whiteside County; and IL 92 from IL 78 to Bureau County Line in Henry County.Henry, Whiteside · contract 64U18$5.9M1 other bidlet Jan 16, 2026
- 5.8 miles of milling and resurfacing 3 3/4" (designed overlay) for IL 29/26 and milling 3 1/2", resurfacing 3 3/4" (designed overlay) for SBI 29; additional work includes ditch cleaning, pipe culvert replacement, guardrail as applicable, pavement marking, and raised reflective pavement markers. This is located on FAS 318 (IL 29), SBI 29 A (IL 29), FAS 2245 (IL 29/26), starting at the Putnam County line and_ending south of Kansas St. in Bureau Junction, and on SBI 29 (OR 29), from IL 29 to dead end.Bureau · contract 66N78$4.5M0 other bidslet Jan 16, 2026
- Milling and resurfacing, patching, pavement striping, pavment markers, and other related construction work on FAU_Route 6081 north of I-80 in Peru beginning at Il Route 251 and ending at Airport Rd; also on Charles St adjacent to east 3rd Rd in Lasalle County.LaSalle · contract 66R83$836,7440 other bidslet Jan 16, 2026
- Construction of PCC Sidewalk along Lake Street in Kewanee. Includes: storm sewer, PCC entrances, HMA pavement, and seeding.Henry · contract 85783$535,9397 other bidslet Nov 7, 2025
- 9 miles of intermittent resurfacing along Atkinson Rd. from IL 92 to Atkinson and on I-80 ramps south of Atkinson.Henry · contract 64U82$529,8953 other bidslet Nov 7, 2025
- Rehabilitate Taxiway AHenry · contract KE021$488,8261 other bidlet Nov 7, 2025
- 9 miles of intermittent resurfacing from IL 81 to culvert #1083 .25 miles South of I-80 ramps.Henry · contract 64U80$342,7303 other bidslet Nov 7, 2025
- 2.34 miles of cold milling, pavement patching, HMA resurfacing, and inlet erosion repair on IL 81 from 1st St. in Cambridge to 0.2 mile east of IL 82(N).Henry · contract 64P76$2.3M3 other bidslet Sep 19, 2025
- Staged construction of 13.54 miles of 2" milling and stone matrix asphalt surface paving on the I-80 driving and passing lanes between Princeton and Ladd.Bureau · contract 66R32$18M0 other bidslet Jun 13, 2025
- 5.39 miles of milling and resurfacing on I-74: I-280/US 6 Interchange to Henry County Line and I-280: Milan Beltway to the I-74/US 6 Interchange.Rock Island · contract 64R16$12M2 other bidslet Jun 13, 2025
- Milling and resurfacing designed overlay of Il 251 including 4' safety shoulders, shoulder rumble strips, and centerline rumble strips from US 52 to the north limit. 10.99 miles gross.LaSalle · contract 66P54$6.4M1 other bidlet Jun 13, 2025
- HMA resurfacing with aggregate shoulders on CH 24 from US 34 to CH 9.Bureau · contract 87855$2.4M0 other bidslet Jun 13, 2025
- Resurfacing on Esceola Spur for 2.33 miles from East Osceola Rd to IL 93 in Stark County.Stark · contract 68D49$1.1M0 other bidslet Jun 13, 2025
- PCC concrete patching of the parking lot at the lodge at Starved Rock State Park (IDNR) in LaSalle County, IL.LaSalle · contract 46941$513,5345 other bidslet Jun 13, 2025
- Resurfacing of US24/IL 9 from Kingston Mines to W of IL 9 (E). 5.78 miles.Peoria · contract 68J18$9.8M1 other bidlet Apr 25, 2025
- Milling and resurfacing 2" on I 80 from 1.4 miles east of the Bureau County Line to 0.1 miles east of IL 351. Additional work includes shoulder improvement and ramp resurfacing at IL 251, 2.4 miles gross length.LaSalle · contract 66R36$5.3M0 other bidslet Apr 25, 2025
- 2.34 miles of HMA milling and resurfacing on US 6 from IL 78 in Annawan to 0.3 miles west of Bureau County Line.Henry · contract 64U32$1.4M1 other bidlet Apr 25, 2025
- Milling, resurfacing, aggregate shoulders, rumble strips, pavement marking, raised reflective pavement markers, and other related construction items on IL Route 89 beginning at the north approach pavement of SN 006-0178 and ending at Cleveland St in Ladd. It also includes the djacent I-80 Frontage Rd beginning at IL 89 intersection and ends at the Ladd Maintenance facility.Bureau · contract 66R19$987,9510 other bidslet Apr 25, 2025
- 5.91 miles of resurfacing (PPP) project extends from 1.4 miles east of the I-180/IL 26 interchange to IL 89.Putnam · contract 68F90$5.2M0 other bidslet Mar 7, 2025
- Standard overlay on IL 82 from 700N south of Cambridge to IL 17. Approximately 5.87 miles.Henry · contract 64U29$3.0M1 other bidlet Mar 7, 2025
- HMA resurfacing of Iowa Avenue, Proter Street, and Bronson Street from Main Street to Johnson Street in Streator. Inlcudes Curb and Gutter, sidewalks, and storm sewers.LaSalle · contract 87879$1.7M1 other bidlet Mar 7, 2025
- HMA resurfacing wiht HMA and Aggregate shoulders on County Highway 51 from Old Chicago Road to the City of Marseilles.LaSalle · contract 87861$1.5M0 other bidslet Mar 7, 2025
- 2.3 miles HMA milling and resurfacing, patching, pavement marking, and reflective markers on SBI 7C (2775E RD), from US 6 to IL 29 in Bureau County.Bureau · contract 66R29$1.5M0 other bidslet Mar 7, 2025
- Resurfacing and shoulder widening on CH 4 from IL 71 to CH 15.LaSalle · contract 87878$1.4M0 other bidslet Mar 7, 2025
- HMA milling and resurfacing, patching, pavement marking and reflective markers on SBI 88 (NEW BEDFORD RD), from Main St in New Bedford to IL 40 in Bureau County. 1.74 mile gross length.Bureau · contract 66R30$985,9030 other bidslet Mar 7, 2025
- Rehabilitate General Aviation T-Hangar PavementLaSalle · contract IL034$580,6000 other bidslet Mar 7, 2025
- Resurfacing Santa Fe Trail from Lourdes Road to Douglas Street, and ADA Ramp improvements at the Douglas/Progress Street intersection.Woodford · contract 89855$754,2061 other bidlet Jan 17, 2025
- Construct a shared-use path along North Bradley Avenue from West Sycamore St. to East Cloverdale Avenue, and along East Cloverdale to South Ridgewood Drive in Chillicothe.Peoria · contract 89865$473,3054 other bidslet Jan 17, 2025
Source: Illinois Department of Transportation, Contract Status, matched by company name.
Matched by company name, so a different firm with a very similar name could appear, and a firm that changed its name may be split. Lowest price usually wins a sealed bid, but not always (responsiveness and RFP scoring decide too).
Source: City of Chicago, Contracts; Cook County, Procurement - Awarded Contracts & Amendments; Cook County, Procurement - Bid Tabulations; City of Chicago, Debarred Firms and Individuals, read Nov 14, 2026. Revisions grouped per contract; bid rank calculated by us; the debarred list is used only for this name check. Cook County does not endorse this product.