Bid Intelligence · company
Peter Baker & Son Co.
0 City of Chicago, Cook County and federal contracts in the last 10 years ($0 in total), 0 still running · 0 Cook County bids on record, lowest price on 0.
Contracts
- No city or county contracts under this name in the last 10 years.
Cook County bids
- No Cook County bid tabulations under this name.
IDOT lettings won
31 contracts where this company was the low bidder ($57M in total).
- (1.630-Mile) Standard Overlay and Curb Ramps Improvements (ADA Improvements) consists of removal and replacement of existing Hot Mix Asphalt (HMA), pavement patching, Portland Cement Concrete (PCC) overlay, curb and gutter removal and replacement, routing, cleaning, and sealing of longitudinal cracks in existing HMA pavement, thermoplastic pavement markings, pedestrian signals improvements (APS), detector loop replacement, raised reflective pavement markers, sidewalk curb ramps improvement. The improvement is in the City of Waukegan in Lake County.Lake · contract 80C93$3.5M1 other bidlet Nov 6, 2026
- (2.75-Mile) Smart Overlay Improvements consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers, pedestrian curb ramp improvements. This project is located within the City of Buffalo Grove and Lincolnshire and Riverwoods in Lake County.Lake · contract 80C62$2.9M1 other bidlet Nov 6, 2026
- (2.3-Mile) pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in the Village of Glenview and Niles in New Northfield Township in Cook County.Cook · contract 62V13$2.5M3 other bidslet Nov 6, 2026
- (2.89-Mile) This project consists of Standard and Design Overlay and ADA Improvements and all incidental and collateral work. The project is in the Village of Glencoe, Village of Winnetka, and the Village of Kenilworth in Cook County.Cook · contract 62W73$4.7M2 other bidslet Sep 18, 2026
- (3,478-Ft) SMART overlay, Traffic Signal Modernization and ADA improvement project consists of hot-mix asphalt surface removal, placement of hot mix surface course, pedestrian ramp improvements, pavement patching, placement of pavement markings.Located within the Villages of Glencoe and Northbrook in Cook County.Cook · contract 62J64$2.9M3 other bidslet Jul 31, 2026
- (3,760-Ft) Standard Overlay, HMA surface removal and overlay, pavement patching maintenance of traffic, pavement marking, landscaping, ADA curb ramps, APS improvements, curb and gutter removal and replacement, median removal and replacement, guardrail removal and replacement, impact attenuator installation, bridge pier crash wall repairs. Located on W. Peterson Road from west of IL 137 to US 45 in the Village of Libertyville in Lake County.Lake · contract 80C48$2.1M1 other bidlet Jun 12, 2026
- (1.2-Mile) Standard Overlay for US 14 and SMART Overlay for South Frontage Road project includes pavement patches, HMA surface removal, resurfacing with HMA binder and surface course, longitudinal joint sealing, curb and gutter removal and replacement, drainage structures adjustments and cleaning, new thermoplastic pavement markings, detector loops replacement, raised reflective pavement markers. The project is located within the City of Woodstock.McHenry · contract 80C45$1.6M3 other bidslet Jun 12, 2026
- (13,136-Ft) Smart Overlay project consists of milling of the existing hot-mix asphalt (HMA) surface, pavement patching, resurfacing with hot-mix asphalt surface course, longitudinal joint sealing, placement of thermoplastic pavement markings. Located on US Route 14 from State Line Road to North of Oak Grove Road in unincorporated McHenry County.McHenry · contract 80B10$1.2M2 other bidslet Apr 24, 2026
- (4.21-Mile) Standard overlay and ADA curb ramp improvement project consists of asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement patching, placement of pavement markings, traffic signal modernization. Located on IL-59 from North of IL-132 (Grand Ave) to US-12, within the Villages of Fox Lake, Lake Villa and Unincorporated Ingleside in Lake County.Lake · contract 80B75$3.3M1 other bidlet Feb 27, 2026
- (6,935-Ft) Designed and Standard Overlays, ADA sidewalk ramp Improvement, pavement patching, milling of existing HMA surface, placing HMA surface course and HMA binder course, drainage structures adjustment and cleaning, placement of pavement markings, installation of sidewalk ramp improvements, located on IL Route 43 (Waukegan Rd.) from Henley Street to Emerson Street in the Villages of Glenview and Morton Grove in Cook County.Cook · contract 62X88$2.8M4 other bidslet Feb 27, 2026
- (1.08-Mile) Standard Overlay and ADA Improvements: curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), hot-mix asphalt (HMA) surface removal and replacement (cold milling and inlay), full-depth patches (Class D), drainage structures adjustments and cleaning, new thermoplastic pavement markings raised reflective pavement markers, accessible pedestrian signals (APS) improvements and detector loops. Location: US 45 (Lake Street), from IL 176 (Maple Avenue) to Woodlawn Drive within the Village of Mundelein.Lake · contract 80B50$1.9M4 other bidslet Jan 16, 2026
- (0.46-mile) Designed Overlay consisting of hot-mix asphalt surface removal, depth patches (Class D), curb and gutter spot repairs (removal and replacement) hot-mix asphalt resurfacing (cold milling and inlay), new thermoplastic pavement markings. Located on US 45 (Lake Street) from north of Tempel Drive to Ramp to IL 137 within the Village of Libertyville.Lake · contract 80B29$1.0M3 other bidslet Jan 16, 2026
- HMA resurfacing on Oak Spring Road from Appley Avenue to St. Mary's Road in Libertyville. Includes; pavement pathcing, ADA ramps, and signage.Lake · contract 61L83$774,0123 other bidslet Nov 7, 2025
- (2.02-Mile) SMART Overlay, Shoulder Repair and ADA Improvements consists (HMA) removal, earth excavation, pavement patching, resurfacing with (HMA) asphalt, full depth hot-mix asphalt shoulder, placement of pavement markings, installation of raised reflective pavement markers, ADA ramps, traffic signals, detector loops. Project located on IL 131 (Green Bay Road) from IL 173 (Rosecrans Road) to Russell Road in the City of Zion.Lake · contract 62V58$3.5M1 other bidlet Jun 13, 2025
- Resurfacing Glenview Road from Milwaukee Avenue to Shermer Road in Glenview.Cook · contract 61L53$2.0M1 other bidlet Jun 13, 2025
- Resurfacing Central Avenue from Golf Road to Dempster Street in Morton Grove.Cook · contract 61L64$1.7M3 other bidslet Jun 13, 2025
- Resurfacing Beckwith Road from Shermer Road to Austin Avenue in Morton Grove.Cook · contract 61L62$1.7M3 other bidslet Jun 13, 2025
- (1466-Ft) Pavement patching, hot-mix asphalt surface removal, resurfacing with hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in Evanston Township and in the City of Evanston.Cook · contract 62X62$1.0M1 other bidlet Jun 13, 2025
- Resurfacing Gross Point Road from Main Street to Oakton Street in Morton Grove.Cook · contract 61L63$929,6833 other bidslet Jun 13, 2025
- (2,955-Ft) Design Overlay and ADA improvements consist of hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermoplastic pavement marking, sidewalk removal and replacement. Project is located in the Cities of Highwood and Highland Park, Lake County.Kane · contract 62X61$922,4692 other bidslet Jun 13, 2025
- (3.38-Mile) Standard and Designed Overlay, ADA Improvements: HMA surface removal and replacement, Class D patches, sidewalk and curb removal and replacement, drainage structures adjustments, detector loops replacement, pavement markings and collateral work. Location 1) Sheridan Road (Naval Station G Street to Moffett Road), Location 2) Scranton Avenue (Green Bay Road to Sheridan Road, both located in the Village of Lake Bluff.Lake · contract 62X32$3.0M0 other bidslet Apr 25, 2025
- Resurfacing on Shermer Road from Golf road to East Lake Avenue in Glenview. Includes; patching, curb and gutter, and ADA improvements.Cook · contract 61L33$2.6M2 other bidslet Apr 25, 2025
- (2.80-Mile) SMART Overlay, Traffic Signal Modernization and ADA Ramp Improvements hot-mix asphalt surface removal, placement of hot mix surface course, pedestrian ramp improvements, pavement patching, placement of pavement markings. Location: IL 59 (Fox Lake Rd) from IL 173 to Highwoods Dr within the Village of Antioch.Lake · contract 62V75$1.9M2 other bidslet Apr 25, 2025
- Resurfcing, curb and gutter, and sidewalk replacement on Galilee Avenue from 21st Street to 33rd Street in Zion.Lake · contract 61L32$892,8381 other bidlet Apr 25, 2025
- (2.07-Mile) Pavement Patching, hot-mix asphalt surface removal and resurfacing, pavement patching, aggregate wedge shoulder and thermoplastic pavement marking. This improvement is in Village of Old Mill Creek and Unincorporated Lake Villa and Antioch Township in Lake County.Lake · contract 62V38$682,9171 other bidlet Apr 25, 2025
- Resurfacing, curb and gutter, and sidewalk replacement on Sheridan Road from Washington Street to south of Liberty Street in Waukegan.Lake · contract 61L31$605,2781 other bidlet Apr 25, 2025
- (3.16 miles) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers, on IL 173 from Northeast of Riegheimer Road to 0.2 miles south of Oak Grove Road. This project is in the City of Harvard and Alden Township.McHenry · contract 62R96$1.3M2 other bidslet Mar 7, 2025
- (1.49-Mile) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers; Location: IL 173, from Harvard Hills Rd to SW of Righeimer Rd within the City of Harvard.McHenry · contract 62T83$622,4852 other bidslet Mar 7, 2025
- Resurfacing Hart Road from West of the Village limits to Round Lake Road in Round LakeLake · contract 61L17$388,2882 other bidslet Mar 7, 2025
- (3.47-Mile) SMART Overlay, curb ramps (ADA) improvements, HMA shoulder additions located on IL 173 from Boone County Line to Flat Iron Road in Unincorporated McHenry County.McHenry · contract 62R95$2.1M2 other bidslet Jan 17, 2025
- Resurfacing Washington Avenue from Western Avenue to Sheridan Road in Highland.Lake · contract 61K91$464,6361 other bidlet Jan 17, 2025
Source: Illinois Department of Transportation, Contract Status, matched by company name.
Matched by company name, so a different firm with a very similar name could appear, and a firm that changed its name may be split. Lowest price usually wins a sealed bid, but not always (responsiveness and RFP scoring decide too).
Source: City of Chicago, Contracts; Cook County, Procurement - Awarded Contracts & Amendments; Cook County, Procurement - Bid Tabulations; City of Chicago, Debarred Firms and Individuals, read Nov 14, 2026. Revisions grouped per contract; bid rank calculated by us; the debarred list is used only for this name check. Cook County does not endorse this product.