IDOT lettings won
12 contracts where this company was the low bidder ($58M in total).
- 5.79 miles of designed overlay on US 6 from 0.1 miles west of Dilenbeck Dr to US 6 (E); and on ILL 82 from Smith St to 0.4 miles south of I-80 (including ramps).Henry · contract 64L41$7.7M1 other bidlet Nov 6, 2026
- 6 miles of of intermittent resurfacing on IL 84 from City of Hampton's Southern limit to Barber Creek Rd and I-80 rest area.Rock Island · contract 64V27$499,0441 other bidlet Nov 6, 2026
- PCC full-depth roadway construction extending Bend Blvd. from 3rd St. to 7th St. in the city of East Moline.Rock Island · contract 85781$6.5M3 other bidslet Jul 31, 2026
- 2.37 Miles of intermittent resurfacing between US 150 and 38th St. along 27th St.Rock Island · contract 64V41$755,2661 other bidlet Jul 31, 2026
- 0.91 miles of reconstruction on IL 81 from 0.2 miles west of Union St to 0.3 miles west of IL 78 in Kewanee. This includes ADA improvements.Henry · contract 64L94$14M3 other bidslet Jun 12, 2026
- Shoulder resurfacing and reconstruction, drainage, erosion control, ditch grading, interim lighting and ITS work at the IL 5/I-74 interchange. Work along I-74 begins approximately 0.6 miles north of IL 5 and ends approximately 0.4 miles south of IL 5. The work along IL 5 begins at 16th St and ends approximately 0.3 miles east of I-74. the gross length of the project is 10,559 ft.Rock Island · contract 64V40$9.0M0 other bidslet Jun 12, 2026
- 5.93 mile SMART project consisting of resurfacing, replacing guardrail, patching, and all related collateral work along Keithsburg Rd from just north of Main St in Keithsburg to just south of Illinois Route 17 in Mercer County.Mercer · contract 68K33$1.9M1 other bidlet Apr 24, 2026
- Construction of a shared-use path along 36th Avenue from 7th Street to 13th Street in East Moline.Rock Island · contract 85763$975,4426 other bidslet Jan 16, 2026
- Construct a 10'x 10' triple barrel reinforced concrete box culvert to carry CH 22 over Toms Creek, 0.5 miles north of Alexis.Mercer · contract 89823$590,4383 other bidslet Jan 16, 2026
- Pavement reconstruction, sidewalks, storm sewer, curb and gutter, traffic signals, lighting, and landscaping on 15 Avenue from 6th Street to 13th Street in East Moline.Rock Island · contract 85774$12M3 other bidslet Apr 25, 2025
- Realign the General Aviation Entrance RoadRock Island · contract QU025$1.9M4 other bidslet Apr 25, 2025
- HMA resurfacing on 19th Street from 7th Street to 16th Street in Moline. Work includes patching, sidewalks with ADA improvments, curb and gutter, pavment markings and traffic signal improvements.Rock Island · contract 85772$1.6M3 other bidslet Jan 17, 2025
Source: Illinois Department of Transportation, Contract Status, matched by company name.
Matched by company name, so a different firm with a very similar name could appear, and a firm that changed its name may be split. Lowest price usually wins a sealed bid, but not always (responsiveness and RFP scoring decide too).
Source: City of Chicago, Contracts; Cook County, Procurement - Awarded Contracts & Amendments; Cook County, Procurement - Bid Tabulations; City of Chicago, Debarred Firms and Individuals, read Nov 14, 2026. Revisions grouped per contract; bid rank calculated by us; the debarred list is used only for this name check. Cook County does not endorse this product.